Gas Processing Units for Balgymbaeva & Makat Fields

Contracted in 2012 and completed in 2013, SPEC rendered the Design, Detailed Engineering and Fabrication of two (2) Glycol Dehydration Units (TEG and EG) for the Treatment of Flare Gas for Geo Energy Group. The additional scope also included two (2) Separator Packages, Pumping Skid, Condensate Stabilization Unit, Heat Exchangers and Control and Safety Shutdown System

Gas Preparation Unit at Makat includes the following:

  1. Inlet Separator and Valve Skid
  2. Skid Mounted TEG Gas Dehydration Unit (6.7 GPM)
  3. EG Unit
  4. JT System
  5. Condensate Stabilization System
  6. HAZOP, Control Systems
  7. Metering, Flare and Instrument Air Packages

Client: Geo Energy Group

Location: Kazakhstan

Completion: 2013

Services: Engineering, Procurement, Construction, Commissioning + Operations & Maintenance

Business Portfolio: Upstream Oil & Gas