TAQA ATRUSH

Dec 2, 2025

Desalting Equipment for TAQA Atrush Field

Contracted and completed in 2019, SPEC provided the Design Engineering, Project Management, Procurement, Fabrication and Commissioning of Two (02) Trains of 15000 BOPD Desalting Equipment for TAQA Atrush field in Kurdistan, Iraq.

SPEC supplied the packages for each train which include:

Electrostatic Dehydrator, Size: 8’ ID X 40’ S/S, NACE, Burner [Duty: 5 MMBtu/hr with BMS Panel]
Cross Exchanger [Duty: 2.6 MMBtu/hr]

Client: TAQA Atrushc

Location: Kurdistan, Iraq

Completion: 2019

Services: Engineering, Procurement, Construction, Commissioning

Business Portfolio: Upstream Oil & Gas